VB Public Works Schedules Detour for West Great Neck Road
VB Public Works Schedules Detour for West Great Neck Road VA Beach Public Works has announced a detour for the area near West Great Neck Road and Adam Keeling Road on Wednesday, April 15, 2020. The detour is scheduled so that crews can relocate a water line to the east side of West Great Neck Road. The detour hours will be from 9 p.m. until 4 a.m. The work is part of a project that will provide a 5-foot wide concrete sidewalk along the west side of West Great Neck Road from Adam Keeling Road to the bridge over Long Creek, approximately 0.2 of a mile. Once completed, the sidewalk will improve safety and provide a connection for pedestrians traveling from Great Neck Point to Shore Drive. The contractor for the job is EL-X Enterprises, and Phillip Blackwell is the project manager. For emergency information, contact him at (804) 698-0989. ### News Releases: VBgov.com/PW/News